56 to that available for a maximum capacity of 5 kW for aerogenerator and 10 kW for hybrid systems. The criteria for site selection has been modified according to which the radial distance of the site from the location of available wind data has been prescribed as 10 km and the minimum annual average wind speed at the site to be 15 kmph (4.17 m/s) at 20 m height. 8.14 Research and Development Field  testing  of  a  3.3  kW  wind  electric  water  pumping  systems  is  in  progress  at  Centre  for  Energy  Technology,  Osmania University, Hyderabad. An R&D project on indigenous development of 250 Watt aerogenerator has been completed by Centre for Energy Technology, Osmania University, Hyderabad. The aerogenerator has developed power up to 250 Watt at the wind speed of 13 m/s and has given maximum efficiency of 36.5% at the wind speed of 6 m/s. The efficiency drop of about 18% has been noted at the rated power generation. This behavior is qualitatively in line with normal characteristic of aerogenerators. R&D  work  on  development  of  a  chiller  plant  through  wind-solar  hybrid  system  is  in  progress  at  the  Centre  for  Scientific Research, Auroville in Tamil Nadu. A project sanctioned for indigenous development of 5 kW aerogenerator is in progress at Auroville Foundation, Tamil Nadu during the current financial year.