55 250 Watt wind electric generator field tested at a site near Anantapur, Andhra Pradesh 8.13 An  aggregate  capacity  of  464.25  kW  of  the  aero-generators/hybrid  systems  has  been  installed  under  the programme, of which 78.6 kW capacity has been installed, during April - December 2005. The remaining sanctioned capacity of aero-generators/wind-solar hybrid systems are under installation. During the year CFA has been restricted A 3.2 KW capacity wind electric generator installed at Terra Farm in village Kivale, Distt. Pune, Maharashtra