53Table8.2State-wise Wind Power InstalledCapacity (as on 31.12.2005)(MW)StateDemonstrationPrivate SectorTotalProjectsProjectsCapacityAndhra Pradesh7.4118.7126.1Gujarat15.3272.5287.8Karnataka7.1479.9487.0Kerala2.00.02.0Madhya Pradesh0.634.535.1Maharashtra8.4646.2654.6Rajasthan6.4306.2312.6Tamil Nadu19.42507.32526.7West Bengal1.10.01.1Others0.51.11.6Total68.24366.34434.5Wind turbines installed at Satara, Maharashtra8.5Demonstration ProjectsA demonstration project of capacity 2 x 1250 kW at Narasimhakonda, Andhra Pradesh was commissioned during the year.8.6Wind-diesel hybrid projectsWind-Diesel Hybrid projects are being taken up, particularly in areas dependent on diesel based electricity generation. Twomachines of 50 kW capacity have been commissioned at Sagar Islands in West Bengal. Work on phase-II project which includeseight 50 kW wind electric generators is an advanced stage and is scheduled to be commissioned during current financial year.8.7ExportsThe export of wind turbines and their components is expected to touch about US $ 65 million during the current year.